woberto Report This Comment Date: December 08, 2015 11:28PM
Quoth the wikipedia;
"A team from the U.S. Army Corps of Engineers dammed the falls in June 1969
in order to clear rock from the base of the falls. Rockslides had caused a
significant buildup of rock at the bottom of the American side of the falls, and
the engineers were to clean up the rock and repair some faults to prevent
eventual erosion of the American side of the waterfall. A temporary dam was
constructed to divert the flow of water to the Canadian side; the dam measured
600 feet (180 m) across and was made of nearly 30,000 tons of rock. The
engineers cleared the rock debris and tested for safety, finishing the project
in November of that year. Water flow was restored on November 25, 1969."
woberto Report This Comment Date: December 08, 2015 11:29PM
